Costs reductions through optimisation
There are a few main factors to be considered to reduce both shop and field costs in connection design.
The design engineers at JITECH have a good understanding of shop’s availability of fabrication equipment to utilize the material that is the least expensive to fabricate and assemble.
Weather conditions during the erection phase as well as the availability of qualified field personnel are other common factors that we take into account.
Value Engineering
Erectors, fabricators and general contractors may desire certain changes be made to the design in order to improve schedule and reduce costs. The engineers at JITECH work to identify alternate approaches and erection methods that are beneficial to the fabricator, the erector or the project’s owner.